provincial-towers
This project required major precast concrete repair again product selection of a non-sag patching material is key
These repairs were located on a 15 story apartment building. These holes were here before we sounded ou the concrete
anytime you have a shelf angle or window lintel exposed and showing signs of deteriation it is time to have them addressed